Recruiter Logo
Now Apply on the Go!
Download engineeristic Jobseeker App and get a seamless experience for your job-hunting
11/01 Ravi Mishra
Manager at Hunarmand India Pvt Ltd

Views:144 Applications:4 Rec. Actions:Recruiter Actions:2

Design & Cost Engineer - Solar Project (2-6 yrs)

Ghaziabad Job Code: 34178

Key Responsibility Areas (KRA) :

- To understand the drawings and the feasibility of the same in reference to the site available for execution, report any inconsistency to BDM & Senior where desired results will not be achieved

- Prepare the execution plan of the site in PERT & GANT Chart

- To ensure that the procurement plan is in line and the material is available as per the planning schedule. Also verify the resource and location for loading and unloading of the material and the basic requirements (Electricity/ Water etc) are available on the site, verify the readiness of the site

- To ensure all the statutory approvals if required are either taken before the initiation of the site or is duly planned as and when required

- To plan and mobilize the contractor and resources required

- Ensure all the material on the site is under proper custody of the authorized person (Contractor) and is safe under lock and key to avoid any damage or loss due to theft and pilferage

- Conduct engineering site audits (Site Survey) to collect structural, electrical, and related site information for use in the design of residential or commercial solar power systems.

- Synchronizing with the team about Quality & Safety standards during the installation of Solar PV Power Plant

- Erection, Installation, testing and commissioning of Solar power plant and provide technical direction during installation, start-up, testing, system commissioning and performance monitoring of the solar power plant

- To execute and monitor solar photovoltaic (PV) generation system performance or energy production to optimize efficiency as per the approved design

- Executing the project within the stipulated budget and timeline

- Adhere to standard operation procedures of quality or safety standards for solar installation work

- Adhere to checklists for review or inspection of completed solar installation projects

- To report stage wise completion to the Reporting Authority and co-ordination with the BD team to ensure recovery of the stage wise payment form the client

- Commissioning of the project and handing over the site to the client with due satisfaction

- co-ordination with the BD team to ensure recovery of the stage wise payment form the cliet

- Preparation of various progress reports as per the requirement of the management

This job opening was posted long time back. It may not be active. Nor was it removed by the recruiter. Please use your discretion.

Add a note
Something suspicious? Report this job posting.