Instrumentation Designer (5-20 yrs)
- Instrument / JB Modelling - SP3D and/or PDS.
- Cable tray modeling including tray supports - SP3D and/or PDS.
- Trench and Duct Bank Routing - SP3D and/or PDS.
- Preparation of Electronic Instrument Layout.
- Preparation of Pneumatic Layout.
- Preparation of Main cable tray routing layout.
- 2D Extraction from 3D model.
- Wiring setup in SPI-INTools for Instruments and Control/Safety Systems.
- Loop diagram and Termination Diagram in SPI.
- Instrument Segment Diagrams (Foundation Fieldbus)
- Instrument Installation Drawing.
- Junction Box Schedule, Cable Schedule, Drum Schedule.
- Control room Cable Routing and Equipment Layout.
- Cable Block Diagram.
- Bulk MTO (Cables, Junction Boxes and Hook-up items).
- Hookup assignment is SPI and drawings generation.
- SP3D (Equipment / Cable Way / Drawing Console) Mandatory
- Smart Plant Review (SPR) Mandatory
- SPI-INTools (Index /Wiring / Loop / Hook-Up/ Modules, Document Binder, Browser and EDE ) Good to have
- AUTOCAD. Good to have
- MICROSTATION. Mandatory
- PDS Mandatory
- PDMS Mandatory
- NAVISWORK Good to have
- Microsoft Office Good to have