Recruitment Manager at Mining & Metal Business
Views:830 Applications:158 Rec. Actions:Recruiter Actions:20
Planner - Mechanical Projects (4-15 yrs)
- Responsible for the planning function of the all approved static equipment jobs included in the turnaround scope.
- Make a site visit to verify scope of work and location of the work, access needed, lifting requirement, insulation removal Identify turnaround activities, estimate resources, durations, establish precedence, as the main input for the scheduling.
- Identify needs of assisted access (scaffolding, man-lifter), insulation removal as preparative activities for the static equipment related works.
- Notify to the Scaffolding Planner Identify flanged joints to be hot-bolting during the pre-turnaround phase; prepare hot-bolting plan Field tagging for the proper identification of the locations of the different static equipment works, which shall include blinds and valves locations.
- Work along with Material Planner and Warehouse personnel to do the Bag and Tag of the material requested for each Work Order, as part of the Pre-Turnaround activities.
- Work closely with the execution contractor to ensure his complete familiarization and commitment with the turnaround plan, which will be a key factor for the success of the turnaround.
- Prepare Work Instructions, Lifting Plans for the static equipment works under turnaround scope. Identify critical lifting operations to require a comprehensive rigging study.
- Candidate must come for personal interview at Baroda, Gujarat
This job opening was posted long time back. It may not be active. Nor was it removed by the recruiter. Please use your discretion.