Sr Talent Aquisition Specialis at Sutra Services Pvt Ltd
Views:233 Applications:22 Rec. Actions:Recruiter Actions:0
Production Planning Engineer - Production & Material Planning (3-6 yrs)
Production Planning Engineer (Production & material planning)
Office Location : Plot No 21, Survey No 1/1, Hardware Park, Raviryala, Hyderabad 500005, Telangana
Landmark : Srisailam Highway, 5mins away from the airport
Working days & time : 6 Days & 8 hours
Job Description : Production Planning Engineer
- Responsible for preparing & monitoring the Master Plan based on customer demand.
- Updated customer Demand regularly from the Project team & shared the same.
- Conducting sunrise meetings with all departments & discussing the daily output against the plan.
- Regularly monitoring the manpower utilizing line-wise against the IE define manpower headcount.
- Preparing model-wise Backlogs against customer demand & discussing with related departments to overcome them.
- Regularly conducting meetings with materials controller & purchase team for four weeks of material visibility.
- Introducing new methods & formats to ensure the accuracy of planning.
- Frequently monitoring the SFCS reports against the plan & uploading the monthly & daily plan regularly in the dashboard.
- Maintaining all ISO documents related to planning & updating regularly.
- Ensure the planning accuracy by preparing metrics & sharing the same to CFT.
- Co-Ordinating with BC & QA team for inventory audit in warehouse & kitting periodically to minimize the mismatch between physical count & SAP stock.
- ECN (Engineering Change Notice) Follow up based on customer requirements.
- Taking Corrective Action for Suspected Materials consumption Plan as per Production schedule to Reduce the EOL Liability.
- Co-0rdinating with P.E & I.E team for line readiness, jigs, SOP & other necessary things
- Conduct regular cycle count audit in FG warehouse and Raw material warehouse and sort the Risk
- Regularly updating the backlogs against the demand model-wise with proper reason with the PM team.
- Co-Ordinating with kitting team for materials movement against MO to FG with proper documents & SAP-related works.
- Coordinating with IT Team for developing UAT Tools as per User Requirements.
- Weekly Shortage Report Preparation based on Production Schedule.
This job opening was posted long time back. It may not be active. Nor was it removed by the recruiter. Please use your discretion.