Managing Director at Peace Mind Services
Views:99 Applications:3 Rec. Actions:Recruiter Actions:0
Senior Engineer - Ceremics Business (5-12 yrs)
Job Description :
Unique Job Role Senior Engineer Function Manufacturing Reporting to Production Head
Business SS Case plant Grade 5 Date
Business description :
Job Details :
The job involves end-to-end activity in ceramic starting from the raw material selection to the manufacturing of the final product. The role holder has to ensure an understanding of the requirement and involves in sourcing, vendor identification, design, manufacture, quality check and assembly.
External Interfaces Internal Interfaces
1. Raw material suppliers
2. Co-working with Ceramic consultants
3. Ceramic vendor
4. Ceramic Institutes 1. Polishing team
2. PPC team
3. Maintenance
4. NPD
5. QED
6. Assembly
Job Requirements :
- Education Bachelor's degree in Ceramic
- Relevant Experience Min 5 years of working in Zirconium ceramic-based precision parts manufacturing including raw material preparation (feedstock), green part manufacturing through injection moulding, de-binding & sintering processes.
- Experienced in machining/grinding of sintered ceramic parts to a high precision level.
An additional advantage - Experience in polishing ceramic parts.
Behavioural Skills - Customer orientation
- Leadership
- People management
- Ambiguity tolerance
- Drive for outputs
- Influencing/convincing ability
- Accountability
- Decision making
- Good communication skills
Knowledge - Technical knowledge of the manufacturing process of high-precision ceramic parts.
- Project and task scheduling
- Analytical skills
- MS office - Excel - VB, Macro, Word & PPT
Process Contributions
Process Contribution Process Outcome Performance Measure
Raw material & source identification :
1. Identify the suitable raw material grade & binder required for the watch case parts.
2. Identify a suitable vendor in the market for the decided raw material.
3. Planning of raw material quantity based on demand.
4. Validate & certify the raw material on receipt.
5. Explore the MSDS documents as per the raw material & incorporating the respective process.
- Raw material specification.
- Suitable vendor/supplier
- Raw material availability
- Inventory level
- Moulding
1. SOP preparation for green part manufacturing as per the grade of the raw material (material size, colour, binder).
2. Carrying out trials & iterations towards finalising the injection moulding parameters & finalising the SOP.
3. Production run of the green parts as per the demand from PPC.
4. In-process inspection
- Green part manufacturing with shrinkage allowance Plan Vs Actual (quantity & lead time)
- Yield
- FTA
- Cost of Manufacturing
- De-binding
1. SOP preparation for the de-binding process as per the part complexity.
2. Carrying out trials & iterations towards finalising the de-binding process parameters like temperature & soaking time.
3. Production run of the de-binding process.
4. In-process inspection.
Brown part Plan Vs Actual (quantity & lead time)
1. SOP preparation for brown part/sintering parts through the machining process.
2. In-process inspection.
3. Planning of tools, Jigs & fixtures.
Machined parts as per the drawing Plan Vs Actual (quantity & lead time)
Sintering
1. SOP preparation for the sintering process as per the part complexity.
2. Carrying out trials & iterations towards finalising the sintering process parameters like temperature & soaking time to ensure the part density and hardness.
3. Production run of the sintering process.
4. In-process inspection.
5. Interface with the injection moulding process for achieving the required accuracy of the finished product.
Final part as per the drawing Plan Vs Actual (quantity & lead time)
Quality
1. Agree on the quality metrics like FTA, yield and COQ.
2. Handling the rework & rejection as declared by the QED.
3. Scrap disposal procedure as per the materials.
4. CAPA as per the feedback from QED
SLA document Plan Vs Actual
Response to feedback through CAPA
Others
1. Ensuring the safety procedure implementation in all the processes involved.
2. Ensuring the 5S implementation through the work procedure.
Volume generated with ISCM OTS
No of presented vs No of models selected
This job opening was posted long time back. It may not be active. Nor was it removed by the recruiter. Please use your discretion.