Recruiter Logo
Now Apply on the Go!
Download engineeristic Jobseeker App and get a seamless experience for your job-hunting
22/12 Arima
HR at Pplanet HR

Views:573 Applications:89 Rec. Actions:Recruiter Actions:17

Senior Engineer - Underground Metro Station (5-8 yrs)

Mumbai Job Code: 8893

URGENT REQUIREMENT :

- Supervising, Monitoring and Execution of underground Delhi Metro Rail (phase 2 & 3), Cut and Cover, station by using top to down and bottom up construction method and carry out inspection with client and consultant

Industry : Construction / Engineering / Cement / Metals

Functional Area : Other

Role : Other

Keyskills : metro rail metro railway dmrc railway metro rail railway excution cut &cover

Education : UG: B.Tech/B.E. - Any Specialization, Civil

This job opening was posted long time back. It may not be active. Nor was it removed by the recruiter. Please use your discretion.

Add a note
Something suspicious? Report this job posting.